What should be prepared before the construction of pipes and fittings?

2026-03-10 14:10:22
times

The application of pipe fittings in the construction industry is very extensive, due to the good advantages of PE pipe fittings. However, before using PE pipe fittings, sufficient preparation should be made to avoid any problems in the later stage. steel-plastic composite pipe

Before installing PE pipe fittings, it is necessary to dig a trench, and the excavated soil should have a reasonable stacking place, and the trench should not be too close, with a distance of more than two meters. The excavated soil should be transported to the outside in a timely manner to avoid affecting future work. During the construction of PE pipe fittings, mechanical operation must be used to excavate to a depth of 20 centimeters above the designed trench bottom elevation, and workers can be hired to excavate the remaining parts.

In order to ensure the safety, duration, and quality of construction, it is necessary to fully understand and investigate the soil and groundwater level of the construction site before construction, so as to ensure that accidents will not occur during construction.


Tags

  • menu
National service hotline

+86-412-3603118

Tel:+86-412-3605055/3605066

Fax:+86-412-3603118

Email:lhbgs.ok@163.com

Add:Tiexi Development Zone, Haicheng City, Liaoning Province

Url: www.lhdxgg.com

底部二维码

扫码手机网站

Copyright © HaiCheng Liaohe Large Steel Pipe Co., Ltd. All rights reserved
record number:
#
在线客服

x