The application of pipe fittings in the construction industry is very extensive, due to the good advantages of PE pipe fittings. However, before using PE pipe fittings, sufficient preparation should be made to avoid any problems in the later stage. steel-plastic composite pipe
Before installing PE pipe fittings, it is necessary to dig a trench, and the excavated soil should have a reasonable stacking place, and the trench should not be too close, with a distance of more than two meters. The excavated soil should be transported to the outside in a timely manner to avoid affecting future work. During the construction of PE pipe fittings, mechanical operation must be used to excavate to a depth of 20 centimeters above the designed trench bottom elevation, and workers can be hired to excavate the remaining parts.
In order to ensure the safety, duration, and quality of construction, it is necessary to fully understand and investigate the soil and groundwater level of the construction site before construction, so as to ensure that accidents will not occur during construction.
Tel:+86-412-3605055/3605066
Fax:+86-412-3603118
Email:lhbgs.ok@163.com
Add:Tiexi Development Zone, Haicheng City, Liaoning Province
Url: www.lhdxgg.com
扫码手机网站